FULL SOLUTIONS FOR YOUR PROJECT

Our solutions provide more power, demand less fuel with the latest fleet in Brazil. We have the know-how to serve various complex projects anywhere in Brazil or Latin America.

gerador

Request a quote here

DON’T YOU KNOW THE CAPACITY YOU NEED FOR YOUR PROJECT?

USE OUR ENERGY CALCULATOR

CALCULATE NOW

SEGMENTS

With our solutions in power generator rental, in air conditioning and cooling or in power generation projects, we meet the needs of several market segments. Get to know our projects:

Oil and gas

Oil & gas is one of the most defying segments for temporary power supply. Due to Brazilian Pre-Salt oil exploration and more than 100 offshore rigs that do not belong to the National Interconnected System (SIN) operate in the Brazilian coast, the use of generators is crucial.

LEARN MORE

Case

Oil & Gas State Company

The Oil & Gas segment makes use of a chain of specialized suppliers, among them are the suppliers of offshore rigs. In times of competitive market, these companies must work optimizing their costs constantly. To assist the customer in saving energy, Tecnogera presented a customized solution in energy supply. It allowed them to enhance the operation, as the generation of energy via generators supplied the offshore rigs during the period of docking.

KEEP READING

Oil & Gas State Company

Natural gas distribution services have boomed in the last decade after high investment in infrastructure and supply chain. Companies in this segment can not afford to take the risk to disrupt their services due to power setbacks. This is why Tecnogera provided this customer with the needed solution so their natural gas distribution services would not be disrupted: a 500KVA generator set in stand-by mode and all suitable accessories for prompt automated

KEEP READING

Oil & Gas State Company

The Oil & Gas segment makes use of a chain of specialized suppliers, among them are the suppliers of offshore rigs. In times of competitive market, these companies must work optimizing their costs constantly. To assist the customer in saving energy, Tecnogera presented a customized solution in energy supply. It allowed them to enhance the operation, as the generation of energy via generators supplied the offshore rigs during the period of docking.

CONTINUE LENDO

Oil & Gas State Company

Natural gas distribution services have boomed in the last decade after high investment in infrastructure and supply chain. Companies in this segment can not afford to take the risk to disrupt their services due to power setbacks. This is why Tecnogera provided this customer with the needed solution so their natural gas distribution services would not be disrupted: a 500KVA generator set in stand-by mode and all suitable accessories for prompt automated

CONTINUE LENDO
Mining

In 2015, iron ore exports surpassed 340 Million metric tons, which qualified the segment as one of the most promising in Brazil. To make the project of an extraction mine feasible, the use of temporary power is crucial. The generators are accountable for the input of all heavy duty machinery, ventilation system, safety alarms and emergency lights.

LEARN MORE

Case

Mining Multinational

Heavy duty machinery present high power consumption. They are part of a great-sized structure with large scale production capacity of iron ore extraction. This company is a mining global benchmark and has know-how in this type of operation, however they needed a partner for the needed power supply to move the machinery with agility and cost optimization. It was a CAT6040 with a 1516, 0 kW engine that moves its 405 metric tons.

KEEP READING

Company in Mining Industry

Mining pipelines are highly advantageous versus other forms of transport for mineral slurry, whether they are ore, coal or bauxite. This pipelines cover great distances and require high-power pumps to move the material through hundreds of kilometers. Tecnogera developed a custom solution for this highly complex project.  We provided them with 30MVA divided along 8 plants that worked up to 24 hours a day.

KEEP READING

Mining Multinational

Heavy duty machinery present high power consumption. They are part of a great-sized structure with large scale production capacity of iron ore extraction. This company is a mining global benchmark and has know-how in this type of operation, however they needed a partner for the needed power supply to move the machinery with agility and cost optimization. It was a CAT6040 with a 1516, 0 kW engine that moves its 405 metric tons.

CONTINUE LENDO

Company in Mining Industry

Mining pipelines are highly advantageous versus other forms of transport for mineral slurry, whether they are ore, coal or bauxite. This pipelines cover great distances and require high-power pumps to move the material through hundreds of kilometers. Tecnogera developed a custom solution for this highly complex project.  We provided them with 30MVA divided along 8 plants that worked up to 24 hours a day.

CONTINUE LENDO
Renewable Energy

Tecnogera actively participates of the expansion of the Brazilian renewable power matrix. More than 2,000 wind turbines have been commissioned by Tecnogera. With complete solutions from construction phase to the finishing, as well as plant commissioning for the service delivery, Tecnogera makes the construction of wind, solar and biomass power plants feasible across Brazil and Latin America.

LEARN MORE

Case

Independent Aeolic Power Plant

The use of Aeolic power has constantly increased worldwide and Brazil is not left out of this trend with its continuous percentage growth of Aeolic plants in the past few years. During the construction of these plants, before wind turbines were connected to the power grid, it was crucially important to conduct inspection tests and to assess the power capability of each turbine and for doing do, the charging bench is used. It simulates several power demands in a controlled environment to ensure the perfect functioning of the wind turbines after it is connected

KEEP READING

Independent Biomass power generator

New power generation forms are under development by several fronts. One of them is the generation of power through biomass, which is a renewable and affordable source through several inputs, such as sugar cane. For this commissioned project, we provided the existent generator, which burns the sugar cane pomace as raw material with charging benches, as well as with power supply done by eight 1,100KVA generators, the entire required structure and operation by trained labor.

KEEP READING

Independent Aeolic Power Plant

The use of Aeolic power has constantly increased worldwide and Brazil is not left out of this trend with its continuous percentage growth of Aeolic plants in the past few years. During the construction of these plants, before wind turbines were connected to the power grid, it was crucially important to conduct inspection tests and to assess the power capability of each turbine and for doing do, the charging bench is used. It simulates several power demands in a controlled environment to ensure the perfect functioning of the wind turbines after it is connected

CONTINUE LENDO

Independent Biomass power generator

New power generation forms are under development by several fronts. One of them is the generation of power through biomass, which is a renewable and affordable source through several inputs, such as sugar cane. For this commissioned project, we provided the existent generator, which burns the sugar cane pomace as raw material with charging benches, as well as with power supply done by eight 1,100KVA generators, the entire required structure and operation by trained labor.

CONTINUE LENDO
Trade and Services

Power reliability is crucial for the functioning of commercial establishments and service providers. Without it, the whole chain becomes fragile and runs risks of incurring loses. In this scenario, temporary power is crucial, mainly for the expansion of retailers, wholesalers, shopping centers, large business developments or on dates of greater people influx in stores.

LEARN MORE

Case

Odata Colocation

Tecnogera was hired to provide several solutions along these stages: we have initially made generator set available as well as support equipment for the structural period, which would meet their demands. Seven months after the construction had started, we installed a generator plant to account for the power supply during the period installation of their power grid. It enabled earnings for up to a month during test and structure commissioning, which is crucial for Data Centers

KEEP READING

Retailer Chain

Tecnogera Solution: Large retailer chains constantly seek for standardizing their servicer and suppliers. Their main challenge is finding partners that serve the same quality services nationwide to rely on. Especially when it comes to urgent services for which promptness is crucial for the resolution of their needs. For this national chain

KEEP READING

Odata Colocation

Tecnogera was hired to provide several solutions along these stages: we have initially made generator set available as well as support equipment for the structural period, which would meet their demands. Seven months after the construction had started, we installed a generator plant to account for the power supply during the period installation of their power grid. It enabled earnings for up to a month during test and structure commissioning, which is crucial for Data Centers

CONTINUE LENDO

Retailer Chain

Tecnogera Solution: Large retailer chains constantly seek for standardizing their servicer and suppliers. Their main challenge is finding partners that serve the same quality services nationwide to rely on. Especially when it comes to urgent services for which promptness is crucial for the resolution of their needs. For this national chain

CONTINUE LENDO
Industry

Power is one of the main inputs of Brazilian industry. At times, it accounts for more than 40% of production costs in several segments, which directly affects the consumer price of manufactured items. With many manufacturing lines operating uninterruptedly, the use of temporary power has become more and more consolidated as the natural way for factories of different kinds and sizes.

LEARN MORE

Case

Danone Alimentos

Necessidade: Instalar uma fonte suplementar de fornecimento energético para maior segurança do Centro de Distribuição resfriado, o maior da empresa no Brasil.

KEEP READING

Danone Alimentos

Necessidade: Instalar uma fonte suplementar de fornecimento energético para maior segurança do Centro de Distribuição resfriado, o maior da empresa no Brasil.

CONTINUE LENDO
Events

Brazil is known for its parties, concerts, congresses and professional fairs. Not to mention sports events and the greatest of them all: the Olympics, for which Tecnogera was the official power supplier at more than 25 locations in the city of Rio de Janeiro.

LEARN MORE

Case

Rio 2016 Olympic Games

The Olympic Games are the greatest event in the world. Every 4 years, athletes from all continents gather to represent their countries, compete in several modalities, overcome limits and be art of our history. There was great expectations towards the structure for the Rio 2016 Games. The complexity and dimension of this event made it crucial that the entire chain of suppliers would be fully committed not to have any setbacks. Tecnogera was in charge of a greatly important role

KEEP READING

The Voice Brazil

TV shows may have several formats, from mobile links to great auditorium structures with sophisticated lighting systems, image recording, remote video editing stations and sound equipment suitable for large concerts. And for doing so, they demand great power volume. In live broadcasting, the concern is even greater as these systems could not take the risk of a disruption in power supply. It would damage equipment, cause flaws to the broadcasting, as well as irreparable financial losses

KEEP READING

Taste Of São Paulo - IMM Produções

O uso de geradores é fundamental para garantir a realização de grandes eventos como o Taste of São Paulo. Por demandar alto volume de energia em determinado período de tempo, o uso de geradores é uma solução prática, eficiente e altamente segura para os organizadores.

KEEP READING

Rio 2016 Olympic Games

The Olympic Games are the greatest event in the world. Every 4 years, athletes from all continents gather to represent their countries, compete in several modalities, overcome limits and be art of our history. There was great expectations towards the structure for the Rio 2016 Games. The complexity and dimension of this event made it crucial that the entire chain of suppliers would be fully committed not to have any setbacks. Tecnogera was in charge of a greatly important role

CONTINUE LENDO

The Voice Brazil

TV shows may have several formats, from mobile links to great auditorium structures with sophisticated lighting systems, image recording, remote video editing stations and sound equipment suitable for large concerts. And for doing so, they demand great power volume. In live broadcasting, the concern is even greater as these systems could not take the risk of a disruption in power supply. It would damage equipment, cause flaws to the broadcasting, as well as irreparable financial losses

CONTINUE LENDO

Taste Of São Paulo - IMM Produções

O uso de geradores é fundamental para garantir a realização de grandes eventos como o Taste of São Paulo. Por demandar alto volume de energia em determinado período de tempo, o uso de geradores é uma solução prática, eficiente e altamente segura para os organizadores.

CONTINUE LENDO
Construction Industry

Some building sites are actual cities and may gather hundreds of professionals who work in different fronts and uninterrupted shifts. Regardless of their size, the use of power generators is crucial to ensure the functioning of general equipment, such as tower cranes, welding and cement machinery, as well as the necessary infrastructure for lodging and dining areas

LEARN MORE

Case

Odata Colocation

Tecnogera was hired to provide several solutions along these stages: we have initially made generator set available as well as support equipment for the structural period, which would meet their demands. Seven months after the construction had started, we installed a generator plant to account for the power supply during the period installation of their power grid. It enabled earnings for up to a month during test and structure commissioning, which is crucial for Data Centers

KEEP READING

Sabesp

Installation of gas-fired thermoelectric plant for water pumping through reservoirs. Tecnogera Solution: The connection of systems Rio Grande (part of Represa Billings reservoir) and Alto Tiete (Represa Taiaçupeba reservoir) was one of the main interventions the State government made in Sao Paulo after the draught in 2014 with the aim of slackening the use of Cantareira reservoir system. During that period, Sao Paulo went through a draught and a water conservation plan due to the shortage of rain and low water levels in reservoirs.

KEEP READING

Odata Colocation

Tecnogera was hired to provide several solutions along these stages: we have initially made generator set available as well as support equipment for the structural period, which would meet their demands. Seven months after the construction had started, we installed a generator plant to account for the power supply during the period installation of their power grid. It enabled earnings for up to a month during test and structure commissioning, which is crucial for Data Centers

CONTINUE LENDO

Sabesp

Installation of gas-fired thermoelectric plant for water pumping through reservoirs. Tecnogera Solution: The connection of systems Rio Grande (part of Represa Billings reservoir) and Alto Tiete (Represa Taiaçupeba reservoir) was one of the main interventions the State government made in Sao Paulo after the draught in 2014 with the aim of slackening the use of Cantareira reservoir system. During that period, Sao Paulo went through a draught and a water conservation plan due to the shortage of rain and low water levels in reservoirs.

CONTINUE LENDO

ALL-REGION SUPPORT

We rely on strategically located distribution centers in Brazil and support bases across the entire country and Latin America.

SAO PAULO AND SOUTHERN REGION

Headquarters - Distribution Center
Address: Avenida Robert Kennedy, No. 615 
Suburb: Bairro Planalto – Sao Bernardo do Campo/ Sao Paulo
Postal Code: CEP 09895-003
Phone Number: +55 11 5021-5217 / +55 11 4053-4888 0800-772-1601


Sao Paulo Branch (Inland)
Address: Alameda Portugal, No. 93 – Room: sala 23 – Floor Suburb: Jardim Europa – Bragança Paulista/Sao Paulo
Postal Code: CEP 12919-055
Phone Number: +55 11 4034-3181 / + 55 11 4033-3141 0800-772-1601

MINAS GERAIS AND CENTRAL-WESTERN REGION

Minas Gerais Branch Address: Avenida Heraclitto Mourao de Miranda, No. 1,072
Suburb: Castelo – Belo Horizonte/Minas Gerais
Postal Code: CEP 31330-142
Phone Number: 0800 772 16 01 or + 55 31 3274-7539

LATIN AMERICA

vendas@tecnogera.com
Argentina + 51 11 5365-0788
Peru +51 1 708-9779

NORTHERN AND NORTHEASTERN REGION

Rio Grande do Norte Branch
Address: Avenida Arena Colombo, No. 50
Suburb: Jardim Portiguar – Macaiba/Rio Grande do Norte
Postal Code: CEP 59-280-000
0800-772-1601


Bahia Branch
Address: Entroncamento BR324 and CIA Aeroporto
Suburb Distrito Industrial SUDIC Dica III, Anel III, No Number
BIG LOG Simoes Filho/Bahia
Postal Code: CEP 43.700.000 
0800-772-1601

Manaus 0800 772 16 01

Acre 0800 772 16 01

RIO DE JANEIRO AND ESPIRITO SANTO

Rio de Janeiro Branch
Rio de Janeiro Branch Address: Rodovia Washington Luis, No. 1980 – Mk 02
Suburb: Parque Santa Marta Duque de Caxias – Rio de Janeiro
Postal Code: CEP 25065-007
+55 21 3439-6258 / +55 21 3439-6275 0800-772-1601